Download PDFOpen PDF in browserTechno-Economic Study of SS Marginal Gas Field Development Using Integrated Production SimulationEasyChair Preprint 82585 pages•Date: June 12, 2022AbstractThere are many marginal fields in Indonesia that have not been developed and have the potential to be profitable if a proper techno-economic study is carried out. The SS field is a marginal offshore gas field with small reserves. The challenge is how to economically develop the SS field, which is 30km from the nearest island. The research method is to conduct technical studies using integrated production simulations as inputs to economic calculations, then apply drilling and pipeline technology to optimize production and reduce costs. At beginning NPV of this field was USD -2.5 Million, but after a techno-economic study using integrated production modelling NPV of this field became USD 35.6 Million Keyphrases: Marginal field, Techno-economic, drilling & pipeline technology, integrated simulation, small reserves
|