Download PDFOpen PDF in browser

Techno-Economic Study of SS Marginal Gas Field Development Using Integrated Production Simulation

EasyChair Preprint 8258

5 pagesDate: June 12, 2022

Abstract

There are many marginal fields in Indonesia that have not been developed and have the potential to be profitable if a proper techno-economic study is carried out. The SS field is a marginal offshore gas field with small reserves. The challenge is how to economically develop the SS field, which is 30km from the nearest island. The research method is to conduct technical studies using integrated production simulations as inputs to economic calculations, then apply drilling and pipeline technology to optimize production and reduce costs. At beginning NPV of this field was USD -2.5 Million, but after a techno-economic study using integrated production modelling NPV of this field became USD 35.6 Million

Keyphrases: Marginal field, Techno-economic, drilling & pipeline technology, integrated simulation, small reserves

BibTeX entry
BibTeX does not have the right entry for preprints. This is a hack for producing the correct reference:
@booklet{EasyChair:8258,
  author    = {Suryo Adi Putranto and Sukirno},
  title     = {Techno-Economic Study of SS Marginal Gas Field Development Using Integrated Production Simulation},
  howpublished = {EasyChair Preprint 8258},
  year      = {EasyChair, 2022}}
Download PDFOpen PDF in browser